![PTT GSP Fitness for Service, Rayong](http://ultrapipeservice.com/wp-content/uploads/2023/03/PTT-GSP-Fitness-for-Service-Rayong.png)
PTT GSP Fitness for Service, Rayong
Client : Dacon Inspection Technologies
Service : Preform Fitness-for-service for 8″ and 10″ onshore LPG pipelines
![U-Tapao International Airport Hydrant Fuel Phase](http://ultrapipeservice.com/wp-content/uploads/2023/03/U-Tapao-International-Airport-Hydrant-Fuel-Phase.png)
U-Tapao International Airport Hydrant Fuel Phase 1, Chonburi
Client : Index, McTric and Chuksamet Port
Service : Design and calculation of Water and Jet Fuel Tank farms.
Haliburton A-frame for applying sling lubrication, Songkhla
Client : ESP Group (Asia)
Service : Design A-frame with automatic winch to apply lubrication on sling.
![PTT OR Lubrication Plant Extension, Songkhla](http://ultrapipeservice.com/wp-content/uploads/2023/03/PTT-OR-Lubrication-Plant-Extension-Songkhla.png)
PTT OR Lubrication Plant Extension, Songkhla
Client : ESP Group (Asia)
Service : Performed hydraulic analysis for PTT OR lubrication plant extension at Songkhla.
![GGC Bio complex, Nakornsawan](http://ultrapipeservice.com/wp-content/uploads/2023/03/GGC-Bio-complex-Nakornsawan.png)
GGC Bio complex, Nakornsawan
Client : Attatech
Service : Performed heat transfer and ventilation analysis for molas tank farms.
![PTT GSP Fitness for Service, Rayong](http://ultrapipeservice.com/wp-content/uploads/2023/03/PTT-GSP-Fitness-for-Service-Rayong-1.png)
Thaioil 24” Pipeline Inspection, Chonburi
Client : Dacon Inspection Technologies
Service : Performed minimum required wall thickness calculation for 24” pipeline.
Pipeline Engineer Secondment at CUEL, Bangkok
Client : CUEL
Service : Pipeline Engineer Secondment at CUEL.
![PTTEP Replacement of topside piping, Bangkok](http://ultrapipeservice.com/wp-content/uploads/2023/03/PTTEP-Replacement-of-topside-piping-Bangkok.png)
PTTEP Replacement of topside piping, Bangkok
Client : Experteam
Service : Bidding support.
![Map Ta phut Phase 3 LNG Terminal](http://ultrapipeservice.com/wp-content/uploads/2023/03/Map-Ta-phut-Phase-3-LNG-Terminal.png)
Map Ta phut Phase 3 LNG Terminal
Client : ITD, Gulf
Service : aisson breakwater engineering.
![PTTEP Bongkot Decommissioning](http://ultrapipeservice.com/wp-content/uploads/2023/03/PTTEP-Bongkot-Decommissioning.png)
PTTEP Bongkot Decommissioning Bidding Support
Client : ITD
Service : Onshore Topside and Jacket decommissioning.
![S__473554950](http://ultrapipeservice.com/wp-content/uploads/2023/07/S__473554950.jpg)
Bongkot Offshore platform Dismantling Engineering
Client : ITD, PTTEP
Service : Offshore platform Dismantling Engineering.
![453245](http://ultrapipeservice.com/wp-content/uploads/2023/03/453245.png)
Pipe stress analysis 12” piping for pigging demonstration, Dexon, PTT
Service : Piping for pigging demonstration.
![30” pipe repair sleeve design and analysis, Experteam, PTTEP](http://ultrapipeservice.com/wp-content/uploads/2023/03/30-pipe-repair-sleeve-design-and-analysis-Experteam-PTTEP.jpg)
30” pipe repair sleeve design and analysis, Experteam, PTTEP
Client : Experteam, PTTEP
Service : Pipe repair sleeve design and analysis.
![Chevon pipeping](http://ultrapipeservice.com/wp-content/uploads/2023/03/Chevon-pipeping.jpg)
CHEVRON PIPELINE DECOMMISSIONING
Client : PTSC Vietnam
Service : Offshore A -frame engineering design
![CVX Subsea Pipeline Decommissioning, Gulf of Thailand](http://ultrapipeservice.com/wp-content/uploads/2023/03/CVX-Subsea-Pipeline-Decommissioning-Gulf-of-Thailand.jpg)
CVX Subsea Pipeline Decommissioning, Gulf of Thailand
Client : PTSC Offshore Services Joint Stock Company (POS)
Service : Supplied 10-bar pipe plugs 6”, 10”, 16”
PT Radiant Utama pipeline inspection accessories supply, Indonesia
Client : PT Radiant Utama
Service : Supplied fittings and pipeline accessories for pipeline modification for inspection.
![PTTEP BONGKOT](http://ultrapipeservice.com/wp-content/uploads/2023/03/PTTEP-BONGKOT.jpg)
PTTEP BONGKOT
Service : SUPPLIED 10-bar Pipe Plug 6“
![TPN pipeline](http://ultrapipeservice.com/wp-content/uploads/2023/03/TPN-pipeline.png)
TPN pipeline
Service : Supply sealing disc for bidi pig
CVX subsea pipeline decommissioning.
Service : refurbishment of 6”, 10” and 16” used pipe plugs and fabricate new 6” pipe plugs for Chevron exploration & production (Thailand) subsea pipeline decommissioning project.
PTTLNG interconnecting pipeline
Service : supply foam pigs and BiDi pig for 28” PTTLNG pipeline
![PTTLNG](http://ultrapipeservice.com/wp-content/uploads/2023/03/PTTLNG.jpg)
PTTLNG 28” interconnecting pipeline, hydro test, cleaning, drying, and N2 purging/packing
Service : Interconnecting pipeline, hydro test, cleaning, drying, and N2 purging/packing.
![PTTLNG Nitrogen](http://ultrapipeservice.com/wp-content/uploads/2023/03/PTTLNG-Nitrogen.png)
PTTLNG Nitrogen purging/packing
Service : N2 purging/
packing 3 loops
Rayong Terminal Empty Solvent Product in Pipeline
Service : Empty solvent product in 12” pipeline from tank farm to jetty.
![Picture1](http://ultrapipeservice.com/wp-content/uploads/2023/03/Picture1-1.png)